This project is part of the Klang Valley Mass Transit Project – Jajaran Sungai Buloh-Kajang (SBK) UG1 & UG2 Line. The underground works consists of 9.5km of underground tunnels and seven underground stations. The bored tunnels extend between the North Portal at Semantan and the South Portal at Maluri. The stations are generally of island platform configuration and include new interchanges which link to existing or proposed railway and transit lines.
Our scope is to act as CICE to perform independent review, checking and certification of all the major temporary works design involving the entire length of tunnels and Underground Package UG2 (i.e. Plaza Rakyat Station, Cochrane Station, Maluri Station, Escape Shaft 3 and South Portal) for the safety and design adequacy.
The temporary work scope involves:
CLIENT
MMC Gamuda (MMC Corporation Bhd and Gamuda Bhd Joint Venture)
LOCATION
Klang Valley Malaysia
PROJECT START & END DATE
June 2012 – June 2016
TYPE OF SERVICE
Detailed Engineering